Join our zoo community
Zambar

Penguin Beach Construction

Showing the footprint of the demolished parrot house, the basement of which is going to be used as the pool. 24th February 2011.

Penguin Beach Construction
Zambar, 26 Feb 2011
    • Zambar
      Showing the footprint of the demolished parrot house, the basement of which is going to be used as the pool. 24th February 2011.
    There are no comments to display.
  • Category:
    ZSL London Zoo
    Uploaded By:
    Zambar
    Date:
    26 Feb 2011
    View Count:
    696
    Comment Count:
    1

    EXIF Data

    File Size:
    367 KB
    Mime Type:
    image/jpeg
    Width:
    1600px
    Height:
    1000px
    Aperture:
    f/5.6
    Make:
    Panasonic
    Model:
    DMC-FZ38
    Date / Time:
    2011:02:24 13:31:56
    Exposure Time:
    10/2000 sec
    ISO Speed Rating:
    ISO 80
    Focal Length:
    4.8 mm
     

    Note: EXIF data is stored on valid file types when a photo is uploaded. The photo may have been manipulated since upload (rotated, flipped, cropped etc).